π Overview
Bulk schema generation in OTTO can process many pages in a single job. Because each page uses credits, a large job can use a lot of your Universal Credits (UC) in one go. This article explains what to check if a job used more credits than you expected, how to prepare a refund review request, and how to avoid unexpected charges in future.
Important: Refund requests are reviewed individually by our support team. This article cannot promise a specific outcome, but a complete request helps us review your case faster.
π Why a Bulk Job Can Use Many Credits
- Credits scale with page count. A job that covers hundreds or thousands of pages multiplies the per-page cost by every page included.
- Different numbers can appear in different places. A tool description may mention quota units, while your balance and billing history are shown in Universal Credits. If the two figures do not seem to match, that is worth reporting.
- Large jobs can cover every page in a project. If you ask OTTO to generate schema for all pages, you are asked to approve the action before it runs, but the approval prompt may not show the total credit cost, so check your available credits and the number of pages before approving.
π§Ύ Step 1: Review What Was Charged
- Open Billing and go to the Quota Log tab. If you don't see that tab, use the Universal Credit Usage section on the Plans & Top-ups tab.
- Find the entry for the schema generation job, such as the AI Suggestions quota deduction. Note the date and time, the Product and Triggered By values, and the Amount Changed. Use the project and the pages in the job from your own records.
- Note your available Universal Credits balance on the Billing page before and after the job, if you have both. Otherwise use the Amount Changed values in the Quota Log to work out the change.
- Check how many pages were included in the job.
- Divide the total UC charged by the number of pages to work out the per-page rate you were charged.
- Check for any credits that were already returned or adjusted. This gives you the net charge, which is the amount still outstanding after any adjustments.
π Step 2: Gather Details for Your Request
The more specific your request, the faster our team can review it. Please have the following ready:
- The name or URL of the OTTO project
- The date and approximate time of the job
- The number of pages processed
- The total UC charged and the net amount you are asking to have reviewed
- The per-page rate you expected, and where you saw it, such as a tool description or help page
- The per-page rate you were actually charged
- A screenshot of the tool description, cost information, or billing entry, if available
- Whether you intended the job to cover every page, or only a smaller set
π¬ Step 3: Contact Support
If you need further assistance, open the chat widget in the bottom-right corner of the platform and send your message. A member of our support team will reply in the chat.
In your first message, include the details from Step 2 in one place. This avoids back-and-forth and helps the team check the job against your account records.
β±οΈ What to Expect After You Contact Us
- Our team will review the job record, the number of pages processed, and the credits charged.
- They may ask follow-up questions, such as whether the job was started intentionally for all pages.
- You will receive the outcome of the review in the chat. Outcomes can vary depending on the circumstances of each case.
π‘οΈ How to Avoid Unexpected Credit Use
- Start small. Run schema generation on a handful of pages first and check how many credits were used.
- Calculate before you run. Multiply the number of pages by the per-page credit cost, and make sure your balance and budget can cover it.
- Limit the scope. Choose specific pages or page groups instead of the whole project when possible.
- Check your balance after each batch. Compare it with what you expected before moving on to the next batch.
- Ask first if the numbers look unclear. If a tool description and your billing show different units, ask support in the chat before running a large job.
- Share guidance with your team. If several people use the same account, make sure everyone knows to check page counts before starting bulk jobs.
β Frequently Asked Questions
Will I automatically get a refund if a job used more credits than I expected?
Not automatically. Each request is reviewed individually based on the account records and the details of the job.
Can I cancel a bulk job once it has started?
If a job is still running and you want it stopped, contact support in the chat right away with the project name and time you started it. Credits already used for completed pages may not be recoverable.
Why does my billing show Universal Credits when the tool mentioned quota units?
Different parts of the platform may describe usage in different terms. If you cannot reconcile the two figures, include both in your message so our team can check them.
Should I include the full amount in my request?
Yes. State the net amount you want reviewed, and explain how you calculated it, so the team can verify it against your records.
β Summary
- Bulk schema jobs multiply the per-page cost by the number of pages.
- Check your billing history, page count, and net charge before contacting support.
- Send a complete request in the chat widget, with screenshots and the expected and actual per-page rates.
- Test on a small batch before running large jobs.
If you need further assistance, open the chat widget in the bottom-right corner of the platform and send your message. A member of our support team will reply in the chat.