🔍 Overview
If you manage multiple Keyword Rank Tracker projects, you may notice that each project runs on a different day of the month — even when all are set to a monthly frequency. This article explains how to bring all your projects in sync so they run on the same date every month.
📋 Why Projects Run on Different Days
When you create multiple Rank Tracker projects at different times, each project's recurring run date is based on the date it was first created or configured. Because projects are created on different days, their schedules naturally drift apart. Aligning them to a single shared date requires updating the run schedule for each project individually.
🛠️ How to Change a Project's Run Schedule
- Open your Keyword Rank Tracker and select the project whose schedule you want to update.
- Navigate to the project's Settings.
- Locate the Schedule or Run Frequency section and update the run date to your preferred target date.
- Save your changes.
- Repeat these steps for every project you want to synchronize so they all share the same day each month.
If you are unsure where to find the schedule setting for a specific project, or if the option does not appear available in your account, please reach out to our support team with your project name and a description of what you see — they can confirm the exact steps for your account configuration.
💡 Tips for Keeping Projects in Sync
- Update new projects immediately. Whenever you create a new Rank Tracker project, adjust the schedule right away so it stays aligned with your existing projects.
- Pick a consistent target date. Choose a run date that works for all your projects and apply it uniformly each time you add a new project.
If you need further assistance, open the chat widget in the bottom-right corner of the platform and type human teammate to be connected with a member of our team.