π‘ Why an extra OTTO charge can appear
Each OTTO project uses one licensed site slot. Extra site capacity is a recurring OTTO Sites top-up, not an automatic extra-project fee added whenever the account briefly goes over its limit. That top-up is billed by the site quantity on the subscription when billing runs, not by the domain you intend to keep.
Switching a site from one domain to another updates the same OTTO project. It does not leave the old domain as a second project. A project continues to count until it is deleted, or, if it is only frozen, until its site slot is released 14 days later.
π οΈ Check the project change before you request a refund
Confirm these points in your account:
- Open OTTO and confirm the site you no longer need has been deleted, not merely frozen. A frozen site still uses its slot for 14 days.
- Confirm the replacement domain is the only active project for that site.
- Count projects that still use a site slot, including frozen projects whose slot has not yet been released, and compare that number with the site capacity included in your plan and top-ups. Removing one project does not by itself put every account at or below a six-site limit.
- Note the date and time you removed the extra project.
If the extra site capacity was removed from the OTTO Sites top-up before the renewal was created, that renewal may be eligible for review. If the top-up quantity was still active when the renewal was created, the charge can be valid for that period even if a project was deleted later.
π Find the detailed invoice breakdown
Use these steps to see each amount:
- Sign in to Search Atlas.
- Open your account menu and go to Billing or Invoices.
- Select the invoice that shows the unexpected charge.
- Open the invoice and review its line items. Extra site capacity appears as an OTTO Sites top-up line, not as a fee named for an individual project.
- Record the invoice number, charge date, and both amounts.
The invoice line items are the detailed breakdown. A card statement usually shows only the total, so compare the statement with the invoice inside the platform before you dispute a charge.
β How refund reviews work
Changing a domain or deleting a project does not automatically create a refund. Support compares the invoice with the OTTO Sites top-up and project history, including whether the extra capacity was still active, when the project was removed, and whether the top-up should already have ended.
- Eligible for review: the extra OTTO Sites capacity was removed before the renewal charge was created, or the same OTTO Sites quantity was billed twice.
- May not be refundable: the project was still active on the billing date, or the charge covers time already used during that period.
Approved adjustments are returned to the original payment method. Timing depends on your card provider after the adjustment is issued.
π¬ What to send so we can review faster
If you need further assistance, open the chat widget in the bottom-right corner of the platform and send your message. A member of our support team will reply in the chat.
Include the invoice number, the charge amounts, the date you removed the extra project, and the old and new domain names. Screenshots of the project list and the invoice line items help us confirm the change without another round of questions.