## **📌 What this article covers**

This article explains how to decide between paying per OTTO project and upgrading your plan when you need extra project slots for a short time. It uses a common case: you have 8 active OTTO projects, you need 2 more within 10 days, and 1 of the 8 will finish soon.

## **🧩 How OTTO project slots work**

Each active OTTO project uses one project slot. A slot stays in use until that project is completed or removed from your active projects. A project that is wrapping up still uses a slot until it is actually finished.

You can generally cover extra projects in two ways:

- **Pay per OTTO project** for only the additional projects you need.
- **Upgrade your package** if a higher plan includes enough slots and better matches your ongoing workload.

## **⚖️ Compare the two billing options**

Per-project billing is usually the better fit when the extra need is temporary. A package upgrade is usually the better fit when you expect to keep more projects active after the current work ends.

- **Choose per project** if you only need the two extra projects for a limited period and your active count will drop back to 8 or fewer.
- **Choose an upgrade** if you regularly need more than your current slot limit, or if the package price is lower than continued per-project charges.
- **Do not upgrade only for a few days** unless the package is cheaper than the short-term per-project cost or you already plan to keep the higher capacity.

## **🗓️ Plan for a project that is ending soon**

Timing matters. If one of your 8 projects will finish before the two new projects must start, you may only need one temporary extra slot. If both new projects must start before the old project ends, you may briefly need 10 active projects.

1. Check the expected completion date of the project that is wrapping up.
2. Check the required start dates for the two new projects.
3. Count the highest number of projects that will be active at the same time.
4. Add per-project billing only for the overlap you cannot avoid.
5. Remove or complete the finished project as soon as it is done so it no longer uses a slot.

For a 10-day overlap, paying per project is often more practical than moving to a higher package, unless your long-term workload will stay above your current limit.

## **💰 Review the higher package before you upgrade**

Before choosing a higher package, compare three numbers in your billing area: your current plan cost, the cost of the additional OTTO projects, and the full price of the package you are considering. Include only the slots and features you will actually use.

Promotional pricing and upgrade discounts are not guaranteed and can vary by account, term, and current offer. Do not assume that a quoted package price includes a discount. A teammate can confirm whether any current offer applies before you change plans.

## **✅ Recommended choice for this scenario**

If the extra demand lasts about 10 days and your active count will return to 8 or fewer, continue with per-project billing for the temporary overlap. Upgrade only if you expect to need the additional capacity on an ongoing basis, or if a confirmed package price is lower than paying per project over the period you will use it.

Make the change only after you confirm the maximum number of projects that will be active at once. This avoids paying for a full upgrade when one short overlap is all you need.

## **🛠️ What to check in your account**

- Your current number of active OTTO projects.
- The date the wrapping-up project will be completed.
- The dates the two new projects must become active.
- The per-project price shown for your account.
- The package price, included slots, and billing term before you confirm an upgrade.

## **💬 Confirm pricing with the team**

Billing offers and package eligibility depend on your account, so confirm the exact total before you add projects or upgrade. If you need further assistance, open the chat widget in the bottom-right corner of the platform and send your message. A member of our support team will reply in the chat.